This long term rental property not far from the Otago Polytechnic & University was in drastic need of repair and an upgrade. Our clients were on a tight budget and JDBuilders was only too happy to help advise them on how we could stretch their budget further and still achieve their desired goals.

Initial Scope of Works:

* Remove the existing bath and replace it with a 900x900mm curved shower cubicle.

* Remove the existing vanity with one new 750mm vanity with a mirror.

* Supply Methven Waipori basin mixer, shower mixer & shower rail.

* Line bathroom walls and ceiling with Seratone wall linings.

* Remove existing bathroom flooring.

* Level the floor under the shower & match the existing floor.

* Allow new Robert Malcolm Moduleo Select wood look vinyl planking.

* Install new ex 100x25mm architraves and trim around the window above the existing bath.

Additional work completed:
 
* Replace the rotting external & adjacent wall framing (studs, top & bottom plates) with new in the bathroom. 
 
* Allow for new building paper to the wall, along with replacing existing roofing over bathroom & kitchen area.
 
* New ZincAlume corrugate on new roofing paper and flashings, including 2 penetration flashings. 
 
* New fascia board (ex 200×25) and new ZincAlume spouting to this newly roofed area. 
 
* Two rafters over bathroom to be repaired.
 

Conclusion:

Our clients were so happy with the final result that they asked JDBuilders to come back to upgrade their kitchen, refer to our separate listing on our website.

Photo Credit: Jeffrey Dennison Builders
1 75 Opoho Rd, NEV, Dunedin Bathroom prior to renovation close up JDBuilders
2 75 Opoho Rd, NEV, Dunedin Bathroom prior to renovation JDBuilders
3 75 Opoho Rd, NEV, Dunedin Demolition rotten flooring in the bathroom JDBuilders
4 75 Opoho Rd, NEV, Dunedin Demolition rotten flooring and linings in the bathroom JDBuilders
5 75 Opoho Rd, NEV, Dunedin Demolition and removal of rotten flooring and linings in the bathroom JDBuilders
6 75 Opoho Rd, NEV, Dunedin Close up of rotten flooring and walls in the bathroom JDBuilders
7 75 Opoho Rd, NEV, Dunedin Another close up of rotten flooring and walls in the bathroom JDBuilders
8 75 Opoho Rd, NEV, Dunedin View of the old vanity and linings on the other wall in the bathroom JDBuilders
9 75 Opoho Rd, NEV, Dunedin Old linings on the shower wall in the bathroom JDBuilders
10 75 Opoho Rd, NEV, Dunedin Removal of all the old linings, revealing rotten and damaged framing in the bathroom JDBuilders
12 75 Opoho Rd, NEV, Dunedin Removal of the old flooring showing damaged timbers and work required to restore JDBuilders
13 75 Opoho Rd, NEV, Dunedin Demolition work completed on floor with close up of the previous pipe work for shower JDBuilders
14 75 Opoho Rd, NEV, Dunedin Demolition work reveals damaged exterior walls in the bathroom JDBuilders
15 75 Opoho Rd, NEV, Dunedin New framing for wall installed with first sheet of flooring going down JDBuilders
16 75 Opoho Rd, NEV, Dunedin Another view of newly constructed framing and flooring JDBuilders
17 75 Opoho Rd, NEV, Dunedin View of newly constructed framing and flooring looking towards the door and kitchen JDBuilders
18 75 Opoho Rd, NEV, Dunedin New framing built for the ceiling in the bathroom JDBuilders
19 75 Opoho Rd, NEV, Dunedin New framing constructed for the shower in the bathroom JDBuilders
20 75 Opoho Rd, NEV, Dunedin New linings being installed on the walls in the bathroom JDBuilders
21 75 Opoho Rd, NEV, Dunedin New linings being installed on the walls along with shower tray in the bathroom JDBuilders
22 75 Opoho Rd, NEV, Dunedin New linings being installed for the shower in the bathroom JDBuilders
23 75 Opoho Rd, NEV, Dunedin New ceilings going up in the bathroom JDBuilders
24 75 Opoho Rd, NEV, Dunedin New vanity installed in the bathroom JDBuilders
25 75 Opoho Rd, NEV, Dunedin New shower installation in the bathroom JDBuilders
26 75 Opoho Rd, NEV, Dunedin Completion photo of the bathroom with new flooring and linings along with new fixtures JDBuilders